Best Buy #257-Youngstown, OH (7-2-2024)

Best Buy #257-Youngstown, OH (7-2-2024)

Price: $35.00
(No reviews yet) Write a Review
SKU:
BB257YOH
Availability:
Downloadable Upon Purchase
Minimum Purchase:
1 unit
Maximum Purchase:
1 unit
Adding to cart… The item has been added

QUANTITY TAKEOFF IS COMPLETED-JUST SUBMIT BID:

WHERE THE SPREADSHEET SAYS

PER HOUR: ADD YOUR AVERAGE HOURLY RATE

PRICE: ADD YOUR MATERIAL PRICE PER GALLON, 5GAL PAIL ECT

PRODUCTION RATES CAN BE ADJUSTED THEY ARE JUST SUGGESTIONS BASED ON EXPERIENCE AND COMPETITIVE.

NUMBER OF GUYS CAN BE ADJUSTED THEY ARE JUST SUGGESTIONS BASED ON OUR EXPERIENCE.

Job Description

561 Boardman Poland Rd
Youngstown, OH 44512

This is a sales floor reduction. We will be replacing carpet throughout store, some areas will be carpet cut around on some fixtures. We will be completing disconnects and reconnects for fixture reflow. There will be trenching for the Apple Pad so please allocate the proper electrical floor boxes as well as the connectrac that is called out for installation. We also will be painting all 4 walls as well as the swift walls that are being installed. Project to start on 9/9/24 and run for 6 weeks – plan on all day work 4am to noon shifts Monday through Friday.

Bid Proposal Information

Date: 6/22/2024
Project Location:
#0257
YOUNGSTOWN
561 BOARDMAN POLAND ROAD
BOARDMAN, OH 44512-4909


Clarifications: The following proposal is based upon information available in the plans at the time and date of this proposal. All inclusion, Clarifications and Exclusions shall become part of any subcontract issued. Painting shall proceed prior to install of finish items not required for a watertight structure without the presence of other trades.

Bid Set Dated: 6/14/2024

Division 9 Painting

Addenda's: None Reviewed

Inclusions: Per Plans & Bid Set: Gyp Walls, Gyp Ceilings, Gyp Bulkheads, Gyp Soffits, Columns, Conduit, Buglar Bar, Vents, Ceiling Ducts, Doors, Camera Poles, & Frames Paint, Open Structure Ceilings, Columns, 1 Primer 2 Finish Coats, 1 Punch List Touchup

Exclusions: Multiple Mobilizations, Items Not Mentioned in Inclusions Above, Items Not Called Out in Plan Pages, Damage from Other Trades, Utilities, Heat & Water Supply, Floor Covering, Shop Painting, Factory Finished Items, Electrostatic Painting, Glazing, Prevailing Wages,

Estimators Opinion:

This project consists of mainly the open structure ceiling paint. Not all walls get painted but about half of the partitions within the plan. The inside interior portion of doors and frames only. And a few other miscelanious items get painted. This project bids to two GC and the details for bid are on the spreadsheet in notes. 

Phase:
Sub bidding
Type:
Open Shop
Type:
Commercial
Quantity Takeoff Completed:
Ready for Bid
Division 9:
Painting
Bid Due:
7-2-2024

Related Products