QUANTITY TAKEOFF IS COMPLETED-JUST SUBMIT BID:
WHERE THE SPREADSHEET SAYS
PER HOUR: ADD YOUR AVERAGE HOURLY RATE
PRICE: ADD YOUR MATERIAL PRICE PER GALLON, 5GAL PAIL ECT
PRODUCTION RATES CAN BE ADJUSTED THEY ARE JUST SUGGESTIONS BASED ON EXPERIENCE AND COMPETITIVE.
NUMBER OF GUYS CAN BE ADJUSTED THEY ARE JUST SUGGESTIONS BASED ON OUR EXPERIENCE.
Job Description
236 Perry Hwy
Harmony, PA 16037
This project calls for the New Construction with Site Work of a Restaurant.
Bid Proposal Information
Date: 6/16/2024
Project Location:
Wendys - Harmony PA
Clarifications: The following proposal is based upon information available in the plans at the time and date of this proposal. All inclusion, Clarifications and Exclusions shall become part of any subcontract issued. Painting shall proceed prior to install of finish items not required for a watertight structure without the presence of other trades.
Bid Set Dated: 5/21/2024
Division 9 Painting
Addenda's: None Reviewed
Inclusions: Per Plans & Bid Set: Gyp Walls, Gyp Ceilings, Gyp Bulkheads, Gyp Soffits, Exterior, Trash Enclosure CMU Walls, Doors & Frames Paint, Bollards, Open Structure, Return Grilles, 3"x3" Tube Steel, Exposed Duct Work, 1 Primer 2 Finish Coats, 1 Punch List Touchup Interior & Exterior
Exclusions: Multiple Mobilizations, Items Not Mentioned in Inclusions Above, Items Not Called Out in Plan Pages, Damage from Other Trades, Utilities, Heat & Water Supply, Floor Covering, Shop Painting, Factory Finished Items, Electrostatic Painting, Glazing, Prevailing Wages, Line Striping, Stencils, EIFs, Access Ladder,
Estimators Review
This is a Wendys franchise. These are smaller commercial painting projects and the plans call out both Sherwin Williams and PPG paints. The finish schedule is laid out on the spreadsheet. There are up to 14ft ceilings in some areas. Some open structur paint on ceilings as well as gypsum board. The walls are Gypsum. The exterior does have some painting to include trash enclosure CMU and other metal substrates. The GC bid to information is in the spreadsheet notes.
- Phase:
- Sub Bidding
- Type:
- Open Shop
- Type:
- Commercial
- Quantity Takeoff Completed:
- Ready for Bid
- Division 9:
- Painting
- Bid Due:
- 7/3/2024